Four tabs in an app shell that becomes a rail from 600dp, a brighter sky-blue palette with the real UbiSam logo, a Home tab built on Gitea's activity feeds, a Work tab that searches issues and pull requests across repositories, a full-screen code viewer with search, outline and Visual Studio colors, C/C++ header/source pairing, and two-pane layouts for wide windows. The five tasks were built and checked together, so they are one commit: MainActivity, the routes and the shared components belong to all of them. 409 unit tests pass, lint reports 0 errors. Verified on an emulator up to the sign-in screen only; no physical device was available. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
3.9 KiB
3.9 KiB
TASK-051: Home: team activity
Status: implemented; required checks pass; not yet confirmed on a device Owner: Claude Reviewer: human product owner
Outcome
The product owner's main use for the app is watching what the team is doing. Home shows it: today's pushes, open pull requests and new issues; what is waiting on the signed-in person; the repositories with recent activity; and a timeline of who did what, where.
Scope
- Included:
GiteaActivityApi(user and organization activity feeds),GiteaWorkSearchApi.count,HomeViewModel,HomeScreenin a one-column and a two-pane layout, navigation from a timeline row to the branch, pull request or issue it is about. - Excluded: marking anything read, reacting, commenting -- Home only reads. A list of favorites on Home: the repositories shown are the recently active ones, not the starred ones.
Writable paths
app/src/main/java/com/ubisam/ubgitea/feature/home/app/src/main/java/com/ubisam/ubgitea/data/activity/app/src/main/java/com/ubisam/ubgitea/data/GiteaApiSupport.ktapp/src/main/java/com/ubisam/ubgitea/domain/activity/app/src/main/res/values/strings_home.xml
Acceptance criteria
- Home loads the signed-in account's feed, and an organization's feed when one is chosen.
- The timeline can be filtered to pushes, pull requests or issues, and can load older activity.
- A failed count leaves that one tile blank; it never takes the timeline down.
- Failing to list organizations hides the organization filter; it does not fail the screen.
- Activity content that does not parse costs a row its detail, never the feed.
- Starring, watching and mirror-sync activity is left out of the timeline.
- Loading, empty, offline, expired-session and server-error states are all shown.
- No OAuth scope is added.
- Build, unit tests and lint pass.
- The feed's real
contentpayloads were compared against what the parser expects, on the company instance. - Confirmed on the human product owner's device (phone and unfolded Z Fold).
Security and privacy
Read-only, within the scopes the app already requests. Nothing from the feed is logged.
Required checks
./gradlew compileDebugKotlin compileDebugUnitTestKotlin testDebugUnitTest assembleDebug lintDebug
Evidence
Recorded on 2026-09-28 in the worktree awesome-pascal-3f2ada, with Android Studio's bundled JDK (D:\AndroidStudio\jbr, OpenJDK 21). TASK-050 to TASK-054 were built together and checked together:
./gradlew compileDebugKotlin compileDebugUnitTestKotlin testDebugUnitTest assembleDebug lintDebug-- passed.- Unit tests: 409 in 45 suites, 0 failures, 0 errors (289 before this work).
- Lint: 0 errors, 55 warnings (dependency updates, unused resources, KTX suggestions).
- Emulator (API 36,
sdk_gphone64_x86_64): the debug APK installs and launches without a crash and shows the sign-in screen with the logo and the new palette. Nothing past sign-in could be reached: that needs a company account. - Not done: any check on a physical device. None was visible to
adbduring this work. - New tests:
GiteaActivityApiTest(12),HomeSummariesTest(9),HomeViewModelTest(8). - API availability was checked against the company instance's published API description (Gitea 1.23.5), without signing in.
- Unit tests were written by a delegated worker from
handoff/2026-09-28_unit-tests-redesign.md; the full run above was repeated here afterwards.
Known limitations
- The shape of an activity's
contentis not described by Gitea's API; it was taken from Gitea's source, not confirmed against the company instance. The parser is lenient for that reason. - Today's push and issue counts are counted from at most 150 of today's activities; beyond that they are shown as a lower bound ("150+" style).
- Activity bars cover only the activity that was loaded, so a very busy week is under-counted.
Review findings
None yet.